Compliance Required Before Testing

You will NOT be able to test your wing in the wind tunnel if it does not meet the required specifications. Please ensure your prototype is fully compliant before your booked session.

Pre-Testing Checklist

Complete all items before arriving at your booked session. Teams with incomplete setups will not be permitted to test.

  • Wind Tunnel Mount

    Correct location and installation verified

  • Morphing Wing Prototype

    Fully assembled and functional

  • Electronic & Arduino Setup

    Wired, coded, and tested beforehand

  • Servo Motor & Power Supply

    Connected and operational

  • Team Data Sheet

    Ready to record data and morphing wing deflection

Testing Schedule

Practice Testing Weeks 3–5, 8–9

Each team can book a 20-minute pre-testing slot during their Project Class. Purpose: Identify design flaws early, trial morphing functionality, and refine before formal assessment.

Days Times Location
Monday / Thursday 12–2pm; 3–5pm J18-105 Solids Lab
Wednesday / Friday 10am–2pm J18-105 Solids Lab

Formal Testing Weeks 7 & 10

Assessment testing sessions. Access is available only during scheduled times and must be pre-booked via Moodle — no walk-ins permitted.

Days Times Location
Monday / Thursday 12–5pm Design Next Studio (DNS)
Wednesday / Friday 9am–1pm Design Next Studio (DNS)

Book Your Session

Select a testing type, week, and day to see available slots.

Each slot is 20 minutes. Click to select. = Booked

⏱️

20 Minutes

Each testing slot duration

👥

1 Booking

Per group per session type

📍

DNS / J18

Testing locations

Testing Day Process

1

Arrive 5 Minutes Early

Come to your designated location with your fully assembled prototype and all team members ready.

2

Compliance Check

A demonstrator will verify your prototype meets all requirements before testing begins.

3

Mount & Calibrate

Install your wing on the wind tunnel mount and perform final calibration of your Arduino system.

4

Conduct Testing

Run your tests, record data on your team data sheet, and document wing deflection measurements.

5

Pack Up

Carefully remove your prototype, ensure the testing area is clean for the next team.